Architecture

RFIs answered late become variation claims.

Pidgy is an AI email assistant for architecture practices. It sorts the project inbox before you open it, counts the days on every request for information a contractor is waiting on, drafts the reply in your words, and turns what you agreed on site into work the whole team can see.

Ask for a place in private beta →
Gmail and OutlookYou click sendEU data residency

Today 2 of 14 done

Good morning.

Tuesday, 7 April

7 waiting on you·12 waiting on others·Site meeting Thursday

FocusWaitingProjects
BCRFI 042, stair balustrade detail, contractor waiting4dHolds the site
ENStructural engineer needs the revised slab levels2dBlocks issue
CLClient approved the kitchen layout1dReturned
PLPlanning officer, condition 7 discharge3dReply
49 replies drafted · 9 stale follow-ups · 214 to triage

Illustrative data from no real practice

A working week, on average

EmailThe actual work
120+

business emails a day, per person. Perhaps six change what you do.

Radicati Group, Email Statistics Report
23 min

to get back to what you were doing after one interruption.

Mark, Gudith and Klocke, UC Irvine, 2008
28%

of the working week goes to email, before any real work is opened.

McKinsey Global Institute, The social economy, 2012

The drawing is finished. The question about it is four days old.

A request for information arrives from site on Thursday afternoon. It sits behind sixty other emails until Tuesday, and by then the contractor has either guessed or stopped. Both cost money, and one of them becomes a claim.

It is that nothing in the practice counts the days on an RFI, or on the engineer's question, or on the client approval that unblocks the next drawing issue. The only record is a scroll through sent items.

Pidgy does not draw.

Four things it does before you have opened anything.

NLProduct update: rainscreen cladding systemsNewsletter
SWYour BIM licence renews next monthNotification
RFI 042, stair balustrade detail ~20m4 days waitingHolds the site
Engineer needs the revised slab levels ~10mBlocks the issueKaai 12 residential
RNRelease notes: model checkerNotification
WBCPD: fire safety in timber frameNewsletter

You only see what matters

Two hundred a day across the projects, and the ones that matter are the ones with a site behind them.

Client, Kaai 12Sign-off on the window schedule, asked twice16dFollow up
Structural engineerRevised slab loads6dFollow up
Planning officerCondition 7 discharge3dToo soon
Follow up · Client, Kaai 12Drafted

Dear Ms Van Damme, a short reminder about the window schedule we sent on 22 March. The contractor needs to place the order this month to hold the programme. A reply to this email is enough.

SendReady when you are

Follow-ups sorted for you

Which client, consultant or officer owes you which answer, how many days, and the chase already written in your words. You press send.

BCFrom Bram ClaeysContractor, Kaai 12 · Thursday

RFI 042 and the balustrade

We are ready to set out the stair but the balustrade detail on A-521 does not match the section. Can you confirm which one is correct and issue a revised detail before Wednesday? We have the steel fabricator on site then.

Send slab levels to the engineer
Resolve the balustrade detail conflict and issue revised A-521Before WednesdayBram ClaeysKaai 12 residential
Update the window schedule
Kitchen layout approved

Emails become tasks

Who is asking, what for, and by when, lifted out of the RFI and put on the list with the deadline and the project attached.

BCRFI 042, balustrade detailRFI
ENStructural markup, slab levelsConsultant
CLApproval, kitchen layoutClient approval
PLPlanning condition 7, responsePlanning
SPSpecification, external doorsSpecification
NLProduct update, claddingNewsletter

Emails categorised for you

RFIs, consultant markups, client approvals, planning, specifications, product updates. Labelled on arrival, so RFI 042 is one click, not a search.

Illustrative data from no real practice

And then the rest of the day.

Five more things Pidgy does between an email landing and the site being handed over.

  1. Projects

    And it adds up to a picture.

    Every project becomes a project in Pidgy too: open RFIs, outstanding approvals, what the consultants owe, the next issue date.

    Ask for a place in private beta →

    Projects, created for you

    Hoek van Loo, school5 RFIs
    Kaai 12 residentialYou

    AI summary

    Construction stage 68%. Open RFI 042 on the stair, 4 days. Window schedule sign-off outstanding with the client 16 days, which holds the order. Site meeting Thursday.

    68%Stage complete

    Timeline

    Kitchen layout approved
    RFI 042 received from site

    Tasks

    Revise A-521TD
    Window schedule sign-offCV
    Deinze studio fit-outHanded over
  2. Replies

    Three ways to answer it. Or your own words.

    Every thread that needs a reply gets three, and they are the three things you would most plausibly say back given what the contractor or the client asked.

    Ask for a place in private beta →

    Reply to Bram Claeys

    “If we do not get the balustrade detail by Wednesday we will fabricate to the section and claim the difference.” Bram Claeys, this morning

    Three likely answers click one

    Commit to Wednesday
    Hold the fabrication
    Propose a site call
    Write it yourselfAlways available
    Selected draft Edit

    Dear Bram, understood. Revised A-521 will be with you Tuesday close of business. The section is correct; the detail was an earlier revision that should have been withdrawn. I will confirm in writing with the issue.

    SendYou press it
  3. Plan mode

    Your day on one side, the work on the other.

    You drag one into the other, and a week with two drawing issues and a planning deadline in it looks that way on Monday.

    Ask for a place in private beta →

    Plan mode click a task

    Unscheduled

    Revise A-521, balustrade1h
    Slab levels to the engineer20m
    Window schedule chase5m

    Wednesday

    Design review, Kaai 12
    Drop a task here
    Planning call
    Drop a task here
    Practice meeting
    Wednesday has two free hours. Three tasks want them.
  4. Contacts

    You already know who never answers. Now you can prove it.

    Everyone on a project becomes a contact, with how long they usually take and how often they opened the conversation. When the claim arrives, the timeline of who waited on whom is already there.

    Ask for a place in private beta →
    CV
    Charlotte Van DammeClient, Kaai 12 residential
    Usually replies in7 days
    Answered first2 of 12
    Open with her2

    Who replied first

    YouWindow schedule, second ask1 Apr
    YouWindow schedule22 Mar
    CVKitchen layout5 Apr
  5. Ask Pidgy

    Or just ask it.

    “Which RFIs are older than three days?” is a question the project architect answers today from the register and memory.

    Ask for a place in private beta →

    Ask Pidgy

    Which RFIs are older than three days?

    Pidgy

    One. It is holding the stair on Kaai 12:

    RFI 042, balustrade detail · Kaai 12Received 2 April · 4 days, no replyOpen
    TDTom is the project architect. Hand him the reply?Delegate
    Ask anything about your mailbox

Illustrative data from no real practice

Before you let anything near a client mailbox.

You click send

Pidgy drafts. It has no permission to send on your behalf, and there is no setting that grants one.

Hosted in the EU

Data residency in the EU, scoped per mailbox, DPA on request. Export or purge whenever you want.

It never deletes

Nothing is archived, moved, marked read or thrown away. Your mailbox is exactly where you left it.

Never trains on you

Correspondence builds your lists and your drafts. It is never used to train a model, ours or anyone else's.

Questions architects ask

What does it cost?+

Per mailbox, monthly, published when we open to everyone. The first group is free. Asking for a place costs nothing and connects nothing.

Does it issue drawings or manage the register?+

No. It drafts replies, you send them. Drawing issues, revisions and the register stay in your CDE exactly as they do now. Pidgy makes sure the question and the deadline reach the right person in time.

What can it see, exactly?+

The project mailboxes you connect, and only those. The model, the CDE and anything on a workstation are invisible to it by design.

Does it read the drawings?+

No. It knows a markup or an approval arrived and closes the request it belongs to. Reading it is your work.

Does it work in Dutch and French?+

Yes. It reads mixed language mailboxes and drafts in the language of the thread, which on a Brussels site can change from one email to the next.

Our project mailboxes are shared with consultants. Does that work?+

It works on the mailboxes you connect. Everyone with access sees what they could already see. Pidgy never widens access.

A first group, chosen by hand.

Pidgy opens to a small number of practices before anyone else, and we pick them ourselves. If architecture is your trade, tell us and we will be in touch.

Email only, nothing else askedAsking connects no mailboxWe reply either way